Illinois FOG & Grease Trap Rules

Illinois requirements combine state plumbing code with local sewer programs. The verified programs below cover the Metropolitan Water Reclamation District of Greater Chicago and Aurora.

Chicago and MWRD

MWRD sewer-construction requirements generally call for a grease interceptor or basin at restaurants and food-preparation facilities. An outdoor grease trap needs a construction detail and cleanouts upstream and downstream; dishwasher discharges must bypass the trap. A Watershed Management Permit is used for covered sewer-construction work.

Aurora

Aurora’s FOG ordinance requires food-service establishments to install an appropriate grease-removal system, follow a maintenance schedule based on device type, and document cleaning and maintenance for at least three years. Records must be available to the Fox Metro Water Reclamation District on request. The program authorizes inspection, monitoring, compliance, and enforcement.

Permits and inspections

Aurora’s pretreatment program uses permits and compliance records. For Chicago-area construction, confirm the current MWRD permit path with the district and the local municipality.

Local rules

Rockford

Rockford requires interceptors for new or altered commercial food-service installations and accessible exterior units. Rockford detail

Sources

Choose a hauler · How often to pump