Charleston FOG & Grease Rules
Who this applies to
Restaurant facilities may be required to install a grease interceptor (depends on menus), per CSB requirements, which also requires separate piping systems for grease waste and sanitary sewer waste [E03].
Key requirements
- Sizing and installation: Restaurant facilities may be required to install a grease interceptor (depends on menus), per CSB requirements, which also requires separate piping systems for grease waste and sanitary sewer waste [E03].
- Sizing and installation: Details of grease interceptors may be discussed with CSB Environmental Compliance Coordinator [E02].
- Permits: Integrating site storm and sanitary piping into a common customer service pipe will not be permitted [E04] [E09].
- Inspections: Contact CSB Maintenance Department at (304) 348-1084, x 238 to coordinate a camera inspection [E05].
- Inspections: CSB must inspect all of the site customer service piping prior to being back filled [E06].
- Penalties: Failure of the contractor to contact the CSB for a camera inspection and cap inspection of the laterals will result in the contractor having to excavate all laterals and coordinate an inspection with the CSB [E07] [E08].
Choosing a hauler
Sources
- [E02] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf
- [E03] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf
- [E04] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf
- [E05] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf
- [E06] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf
- [E07] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf
- [E08] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf
- [E09] http://charlestonstormwater.org/wp-content/uploads/2018/03/Chapter-9-The-Sanitary-Board.pdf